Training

Installation Instructions

Step-by-step Ty-Gard DS installation guidance for prepare, load, tension, and seal workflows.

Best for

Loading supervisors, warehouse teams, and field trainers preparing Ty-Gard DS installation.

Installation steps

1

Prepare: cut Ty-Gard DS and Ty-Patch DS sections, remove release liner, and apply adhesive to the sidewall.

2

Load: finish loading cargo and pull Ty-Gard DS strips across the load face with overlap.

3

Tension: insert the Ty-Tool through overlapping bands, place the magnet, trim excess, and tension.

4

Seal: apply Ty-Patch across the tensioned barrier and press with a bonding roller or squeegee.

Required tools

1

Ty-Tool tensioning tool

2

Magnet

3

Small wrench

4

Bonding roller or squeegee

5

Safety cutter

Useful next steps

1

Download the Ty-Gard DS brochure

2

Review the training video topics

3

Request training for a loading team

FAQ

The source workflow is prepare, load, tension, and seal.

No. Installation guidance supports field execution, while unusual cargo or routes should be reviewed through a custom load diagram request.

Source materials reference tensioning, trimming, and pressure application tools, including the Ty-Tool, cutter, wrench, and bonding roller or squeegee.